
TECHINAL
DATA OF STRONGMAN INCINERATOR
TYPE
BMW-50
DOUBLE CHAMBER,
CONTROLLED AIR, MANUAL LOADING
1. TECHINAL FEATURES
| Incinerator
Plate Thickness of Primary Chamber |
5 mm. |
| Head Plate
Thickness |
8 mm |
| Chimney
Plate Thickness |
6 mm |
| Thermal
Insulation Thickness of |
50 mm |
| Primary
Chamber & Secondary Chamber |
|
| Refractory
Thickness of |
100 mm |
| Primary
Chamber & Secondary Chamber |
|
| Chimney
Refractory Lining Thickness |
50 mm |
| Warm-up
Time |
20 min |
2. DIMENSIONS
Primary Chamber
| Inner
Diameter |
800 mm abt. |
| Inner
Length |
1500 mm
abt. |
| Volume
0.75 |
m3
abt. |
Secondary Chamber
| Inner
Diameter |
600
mm abt. |
| Inner
Length |
1900
mm abt. |
| Volume |
0.54
m3 abt. |
Chimney
| Inner Diameter |
280 mm
abt. |
| Standard Height Form Ground
Level |
8000 mm
abt |
3. INSTALLED POWERS
| Installed
Electric Power |
kw |
| Voltage |
440/380V/50Hz |
| No of Burners |
02 Nos |
| Thermal Capacity Of The
Ignition min. |
41 KW |
| Burner (Primary Chamber)
max. |
93
KW |
| Thermal Capacity Of The
min. |
116KW |
| Secondary Burner
max |
232KW |
| Fuel to be used City Gas /
Diesel |
|
4. PERFORMANCES
Burning Capacity With
Loader
(Referred to Waste Type C
& D with 2000/2400 Kcal/kg) |
50 kgs/hr abt. |
| Working Temperature of
Primary Chamber |
700C-800C |
| Working Temperature of
Secondary |
Chamber 1100C-1200C |
| Residence Time Of The
Flue-Gases min. |
2 sec. |
| O2
Rate In The Flue-Gases min.
|
6%
|
DIMENSIONS ARE
INDICATIVE:
STRONGMAN reserve the right to carry out
(also during
the supply) the technical improvements that should be
considered suitable.
|